Notifications
Clear all

If I wanted a backyard guest house, how deep would my pockets need to be?

630 Posts
581 Users
0 Reactions
5,595 Views
ruby_hernandez
Posts: 9
(@ruby_hernandez)
Active Member
Joined:

If I could do it over, I’d just follow their checklist from the start... it’s less stressful and probably cheaper in the long run. Those “little” details add up fast.

That checklist is like the Ten Commandments of backyard builds—ignore at your own peril. I thought, “How much could a permit cost?” Turns out, not getting one costs way more. Between surprise fees and the inspector’s eagle eyes, my budget started looking like Swiss cheese. If you think you can cut corners, the city’s gonna find ‘em and charge you for the privilege. Just bite the bullet and budget for all the nitpicky stuff up front... trust me, your future self will thank you.


Reply
Posts: 13
(@znelson57)
Active Member
Joined:

That checklist is like the Ten Commandments of backyard builds—ignore at your own peril.

You nailed it with the “Swiss cheese” budget. I tried skipping a soil test because it seemed unnecessary—big mistake. Ended up needing extra foundation work, which cost way more than the test would’ve. Have you noticed how even the “optional” checklist items somehow become mandatory once you’re knee-deep in the project? Makes me wonder if there’s ever such a thing as over-preparing for these builds...


Reply
Posts: 8
(@retro_marley7729)
Active Member
Joined:

Over-preparing almost feels impossible with these projects, honestly. Every time I think I’ve got all my bases covered, something random pops up—like the city suddenly needing a different type of window or the inspector flagging a minor electrical thing. The “optional” checklist items are sneaky like that... they start as suggestions and end up being must-dos if you want to avoid headaches later.

I totally get what you mean about the soil test. It’s wild how skipping one little step can snowball into a much bigger (and pricier) problem. I once thought I could save by not doing a full lighting plan for a client’s backyard studio—ended up having to redo half the wiring because we missed where outlets would actually be useful. Lesson learned: sometimes overthinking is just thinking ahead.

But then again, there’s always that fine line between being prepared and getting stuck in analysis paralysis. At some point, you just have to jump in and roll with whatever comes up... easier said than done when your wallet’s on the line, though.


Reply
Posts: 11
(@sonicthomas285)
Active Member
Joined:

At some point, you just have to jump in and roll with whatever comes up... easier said than done when your wallet’s on the line, though.

That’s the part that gets me every time. I budgeted for what I thought was “everything” and still got blindsided by utility hookup fees and a random permit requirement. If you’re thinking about a backyard guest house, I’d honestly pad your budget by at least 20% for surprises. Planning is key, but you can’t predict every curveball—sometimes you just have to accept a bit of risk and move forward.


Reply
lunad88
Posts: 3
(@lunad88)
New Member
Joined:

I swear, building anything in the backyard is like opening a mystery box—except the surprise is always another bill. When I did my shed (which, okay, is not a guest house, but still), I thought I had it all mapped out. Then the city wanted a “site plan review” fee, and the power company wanted to charge me for “temporary service” just to run a line for the contractors. I started to wonder if I should just pitch a tent and call it a day.

That 20% buffer is solid advice, but honestly, I’d say if you’re the anxious type, make it 30%. There’s always some weird thing you didn’t think of, like needing a tree survey or finding out your sewer line is exactly where you want to put the foundation. It’s wild. Planning helps, but at some point you just have to laugh at the absurdity and keep going... or else you’ll drive yourself nuts.


Reply
Page 79 / 126
Share:
Scroll to Top