Notifications
Clear all

got denied for a permit—what would you do next?

673 Posts
595 Users
0 Reactions
7,516 Views
surfing134
Posts: 11
(@surfing134)
Active Member
Joined:

Honestly, sometimes I think we overcomplicate it by trying to “educate” inspectors with all the paperwork and code references. Half the time, I’ve had better luck just asking them straight out what would make them happy—saves a lot of back-and-forth. Not saying you shouldn’t document everything, but sometimes less is more. At least in my town, a quick phone call can do more than a binder full of receipts. Guess it depends on who you get stuck with that day...


Reply
crypto881
Posts: 4
(@crypto881)
New Member
Joined:

I get where you’re coming from, but in my experience, having your paperwork tight actually saves your butt when you run into one of those inspectors who’s a stickler. I’ve had a few deals where a casual chat worked, but then I’ve also had guys who wanted to see every last doc. Maybe it’s overkill sometimes, but I’d rather have too much ready than get caught scrambling. Guess it’s just a gamble either way, depends on the mood they’re in that day...


Reply
samskater133
Posts: 13
(@samskater133)
Active Member
Joined:

I’ve had a few deals where a casual chat worked, but then I’ve also had guys who wanted to see every last doc.

- Totally agree that being over-prepared is usually the safer bet. I’ve been burned once when I thought “they’ll never ask for that,” and of course, that was the one time they did.
- One thing I’ve noticed: if you’re doing anything even slightly outside the norm (like using reclaimed materials or eco-friendly systems), the inspectors seem way more likely to want everything in writing. Maybe it’s just unfamiliarity, but it’s happened to me more than once.
- I do think sometimes you can gauge the inspector’s vibe early on, but it’s risky to rely on that. They can switch gears fast if something catches their eye.
- I keep a digital folder with every permit, spec sheet, and product cert. Not saying it’s fun, but it’s saved me from headaches more than once.
- Honestly, I wish the process was more predictable. Sometimes it feels like a coin toss, but at least being organized stacks the odds a bit more in your favor.


Reply
Posts: 13
(@susansniper126)
Active Member
Joined:

I keep a digital folder with every permit, spec sheet, and product cert. Not saying it’s fun, but it’s saved me from headaches more than once.

Right there with you—my “permit folder” is basically my security blanket at this point. I swear, the one time I didn’t have a random paint VOC certificate handy, it turned into a full-on interrogation. Ever tried explaining reclaimed barn wood to someone who’s never seen it? Not my finest hour. Has anyone actually had luck appealing a denial, or is it just more paperwork and waiting?


Reply
rachelreader
Posts: 4
(@rachelreader)
New Member
Joined:

Ever tried explaining reclaimed barn wood to someone who’s never seen it? Not my finest hour.

That hits close to home. I once had to walk a city inspector through why “distressed finish” wasn’t code for “moldy junk.” Honestly, appealing is doable, but yeah, it’s usually just more forms and a longer wait. If you’re missing something minor, sometimes a quick call helps—otherwise, buckle up for red tape.


Reply
Page 111 / 135
Share:
Scroll to Top