Notifications
Clear all

got denied for a permit—what would you do next?

673 Posts
595 Users
0 Reactions
9,214 Views
markc23
Posts: 15
(@markc23)
Active Member
Joined:

Dealing with permit denials can be such a headache, especially when it feels like you’re justifying every design choice. I’ve had to explain “salvaged” materials before and got the same skeptical look—like I was trying to sneak in termite-ridden planks. It’s frustrating, but I’ve noticed inspectors sometimes just need a little more info or reassurance that you’re not cutting corners. If it’s something minor, pushing back (politely) has actually worked for me a couple times. Don’t let the paperwork scare you off—sometimes it’s just persistence and clarifying your intent.


Reply
pallen73
Posts: 9
(@pallen73)
Active Member
Joined:

“I’ve had to explain ‘salvaged’ materials before and got the same skeptical look—like I was trying to sneak in termite-ridden planks.”

Yeah, I’ve gotten that look too—like, just because something’s reclaimed doesn’t mean it’s junk. I totally get the frustration with all the extra explaining. I’ve found that bringing in photos or receipts showing where the materials came from sometimes helps. Inspectors seem to relax a bit if they see you’re not just grabbing stuff off the curb. It’s a pain, but honestly, sometimes it’s worth the hassle if it saves a chunk of money. I try to remind myself that they’re just doing their job, even if it feels like overkill.


Reply
Posts: 15
(@space898)
Active Member
Joined:

Honestly, I’ve run into this a few times. If the permit got denied over salvaged materials, I’d go back with more documentation—photos, receipts, maybe even a quick write-up on where the stuff came from and why it’s solid. Sometimes you just have to spell it out for them. It’s annoying, but I’ve had permits approved after showing proof the materials were up to code. Worst case, swap out anything they’re really hung up on and move forward. Not worth fighting city hall forever.


Reply
daniel_pilot
Posts: 12
(@daniel_pilot)
Active Member
Joined:

I hear you—sometimes it feels like the city just doesn’t get the value of reusing good materials. I’ve had inspectors get really hung up on provenance, even when the salvaged stuff is in better shape than new. Have you ever tried bringing in third-party certification or test results for the materials? I’ve found that can tip the scales, but it’s not always cheap or quick. Curious if anyone’s had luck with that route, or if it just ends up being more red tape...


Reply
Posts: 19
(@photography_hunter)
Eminent Member
Joined:

I’ve run into the same wall with inspectors—sometimes it feels like they’re more concerned about paperwork than the actual quality of what you’re using. I’ve had some luck getting reclaimed wood approved by sending it out for structural testing, but honestly, the cost and wait times can be a pain. One thing that’s helped is documenting every step: photos of removal, storage conditions, even receipts from salvage yards. It’s not foolproof, but sometimes having a paper trail makes them less nervous. Still, I wish there was a more streamlined process for this stuff...


Reply
Page 112 / 135
Share:
Scroll to Top