- Ran into the same nightmare with a 1960s bungalow—thought we were just updating floors, then bam, asbestos tiles and lead paint everywhere.
- Here’s what I learned: always pad your budget for “unknowns.” I usually add at least 20% for surprises like that.
- Demo is where the ghosts come out... old wiring, weird plumbing, sometimes even critters (found a squirrel nest once).
- If you’re dreaming of open beams or exposed brick, factor in extra for safe removal and remediation. It’s not glamorous but it keeps everyone healthy.
- Don’t skimp on the inspection phase. A little upfront cost can save you from major headaches (and wallet pain) later.
- Once you get past the mess, you can really play with light, color, and texture—beach houses are perfect for creative finishes and natural materials.
It’s a slog when you hit those hidden issues, but honestly, the transformation is worth every bit of hassle. Just keep some wiggle room in your budget so you can still splurge on those statement tiles or custom built-ins at the end.
Demo is where the ghosts come out... old wiring, weird plumbing, sometimes even critters (found a squirrel nest once).
Haha, the “ghosts” line is too real. I once opened up a wall in a coastal cottage and found an entire collection of 1970s soda cans—like a time capsule nobody asked for. I always tell clients, budget for beauty but expect a few curveballs. The 20% buffer is smart, but if you’re eyeing custom finishes or anything structural, maybe even a bit more. Once you get past the mess, that’s when the magic happens—sunlight on white oak floors or linen drapes fluttering in the sea breeze... worth every headache.
That 20% buffer seems to be the magic number everyone suggests, but honestly, I’m finding it hard to stick to—especially with all the unexpected stuff popping up. We pulled up some old tile and discovered water damage that wasn’t on anyone’s radar. I’m curious, for those who’ve done beach house renos, did you find labor or materials ended up being the bigger wild card? I’m trying to figure out where to pad my budget a bit more.
We pulled up some old tile and discovered water damage that wasn’t on anyone’s radar.
That’s the kind of surprise that can really throw a wrench in your numbers. In my experience, labor tends to be the bigger wild card, especially in coastal areas where skilled trades are in high demand and schedules shift with the weather. Materials fluctuate, but you can usually get a decent estimate upfront. I’d pad the labor side a bit more, particularly for anything structural or involving moisture remediation. It’s tough to predict every hidden issue, but being methodical with contingencies helps keep things from spiraling.
That’s the thing about older homes near the coast—there’s always a story hiding under the surface, whether it’s water damage or some “creative” fix from decades past. I’ve been through my share of surprises, and I’d argue that even the best contingency plan can get stretched thin once you start peeling back layers. Labor costs are wild, sure, but what really catches people off guard is how quickly one issue leads to another. You spot a bit of moisture, next thing you know you’re tracing it back to a window that was never flashed right in 1972.
I tend to budget at least 20% extra for the unknowns, especially when dealing with anything structural or moisture-related. It sounds like overkill until you’re knee-deep in repairs and grateful for the buffer. Honestly, sometimes I think folks underestimate just how much salt air and shifting sand can do over time. Even materials that look solid on paper can end up failing faster than expected.
Curious if anyone here has tried going the route of phased renovations? Like tackling just one section at a time to keep surprises (and costs) contained? Or is it better to just rip off the band-aid and do it all at once? I’ve always leaned toward phased work for sanity’s sake, but maybe there’s an argument for biting the bullet and getting it done in one go...