Yeah, the “one-day” spray foam ads always make me laugh a bit. In my experience, especially with older houses, you’re looking at a solid week if you want it done right—sometimes more if you hit weird stuff in the walls. Here’s how I break it down:
1. Day 1-2: Prep and inspection (this is where all the surprises show up).
2. Day 3-4: Actual insulation install.
3. Day 5+: Cleanup, sealing up, and fixing whatever oddball issues pop up.
Trying to rush it just means you’ll be back fixing cold spots or leaks later. I’d rather spend a few extra days now than pay for it every winter.
Trying to rush it just means you’ll be back fixing cold spots or leaks later.
Couldn’t agree more, but I’ll admit—I was tempted by those “one-day” deals at first. Then I started tallying up what callbacks and patch jobs would cost me down the road… not worth it. I’d rather live with a little mess for a week than pay double fixing shortcuts. Plus, if you’re on a budget, spreading it out lets you actually see where your money’s going.
Not sure I’m totally on board with dragging it out, though. Here’s the thing—if you’ve got a solid crew and a clear plan, you can get a whole house insulated in a day or two without cutting corners. I’ve seen it done, especially with blown-in cellulose or spray foam. The key is prep: make sure everything’s ready to go, materials on hand, and everyone knows their job.
- Less time open walls = less energy loss and fewer drafts sneaking in.
- Quicker turnaround means you’re not living in a construction zone for ages (which, trust me, gets old fast).
- If you’re using eco-friendly materials, some of them actually perform better when installed quickly and sealed up right away.
I get wanting to keep an eye on costs, but sometimes stretching it out just means more labor hours and more chances for stuff to go sideways. Just my two cents from a few too many “slow and steady” jobs that ended up dragging on way longer than planned...
I think you’re spot on about the value of a well-organized, efficient crew. When everyone’s on the same page and the prep work is solid, it’s impressive how quickly things can move. I’ve watched a neighbor’s place get spray-foamed in a single day—walls buttoned up before dinner, no lingering drafts, and the mess was minimal. There’s definitely something to be said for minimizing the time your house is exposed, especially if you’re living there during the work.
That said, I’ll admit I’ve been guilty of dragging out projects in my own place, mostly because it’s an older home and I tend to overthink every step. Sometimes I worry that moving too fast means missing hidden issues—like old wiring or moisture problems behind the plaster. But honestly, most of the delays have come from indecision or waiting on materials, not from any real benefit to taking it slow.
You make a good point about eco-friendly materials, too. I hadn’t considered that some of them actually perform better when installed and sealed up quickly. That’s a detail that often gets lost in the planning phase.
I guess for me, the biggest lesson has been that a clear plan and good communication with the crew make all the difference. The jobs that dragged on were usually the ones where nobody quite knew what was happening next, or we were constantly running out for supplies. When everything’s lined up, it really does go smoother—and faster.
It’s reassuring to hear from someone who’s seen it done efficiently without cutting corners. Gives me a bit more confidence to push for a tighter schedule next time, rather than letting things stretch out just because “that’s how it’s always been done.”
The jobs that dragged on were usually the ones where nobody quite knew what was happening next, or we were constantly running out for supplies. When everything’s lined up, it really does go smoother—and faster.
This hits home. From what I’ve seen, the difference between a one-day insulation job and a two-week headache almost always comes down to planning and communication. I’ve had crews knock out 2,000 sqft of blown-in cellulose in a single afternoon when everything was staged and ready, but I’ve also watched projects stall for days because someone forgot to order vapor barrier or the right size fasteners.
You mentioned worrying about missing hidden issues by moving too fast. I get that, especially with old houses—sometimes you open up a wall and find a rat’s nest of knob-and-tube wiring or a surprise patch of mold. But do you really think taking it slow actually helps catch those things? In my experience, the pros spot problems right away, almost as a reflex. It’s the indecision and back-and-forth that drags things out, not the actual discovery process.
Curious if you (or anyone else) has found a good balance between speed and thoroughness. Do you have your crew do a full walk-through before demo, or just deal with surprises as they come up? I’ve started insisting on a pre-insulation checklist—quick moisture meter readings, look for obvious wiring issues, that kind of thing. It’s saved me from at least a couple of expensive callbacks.
Also, on the eco-friendly materials front: have you noticed any real-world difference in install time or performance? I tried dense-pack cellulose in one place and it took longer than spray foam, but the air sealing was better. Wondering if the extra time was worth it in the end, or if I should just stick with what gets the job done fastest.
Bottom line, how much time do you budget for insulation on your projects now? Are you pushing for speed, or building in buffer for the “unknowns”?