Remodeling discussions and local services.

Dealing with city red tape for building approvals

458 replies
 

Join the conversation

Share your experience or ask a follow-up question.

surfer984557

Name your files like you’re back in 1998 - no spaces, no dashes, just underscores.

This made me laugh because it’s painfully true. I swear, these portals are allergic to anything but underscores. One time I tried uploading “kitchen-remodel-final-final.pdf” (yes, the double final) and got hit with the dreaded error message. Ended up with “kitchen_remodel_final_final.pdf” and it worked, but only after compressing it three times because apparently a color floor plan is “too large to process.”

And don’t even get me started on the file size thing. Five megabytes is nothing when you’re dealing with high-res elevations. I’ve had to screenshot drawings just to get under the limit, which feels like sending a Polaroid to city hall.

Honestly, I’d almost prefer waiting behind the fence-height debaters. At least then I could zone out and daydream about paint swatches instead of playing file-name whack-a-mole.


Reply

Honestly, I’ve lost count of how many times I’ve had to rename files just to get them through the city’s portal. Underscores everywhere, and don’t even think about using parentheses or special characters. I used to think “final_final” was just a running joke from architecture school, but here we are, still doing it because the system can’t handle anything else.

The file size limits are wild too. I once had to break up a single elevation into three separate PDFs just to meet the requirements - ended up feeling like I was submitting a jigsaw puzzle. Ever notice how some cities will accept a giant TIFF, but others freak out if your PDF is over 2MB? It’s like there’s no standard at all.

Curious if anyone’s figured out a good workflow for this. Do you compress everything before uploading, or just keep trimming until something sticks? I’ve tried exporting at lower DPI but then the reviewers complain the text isn’t legible... seems like a lose-lose.


Reply
steven_furry

Man, the file naming thing drives me nuts too. I swear, I’ve got folders full of “final_final2” and “final_for_real_this_time” just because the portal throws a fit over a dash or space. I usually end up compressing everything first, but sometimes it’s a gamble - too much compression and the plans look like they were faxed in from 1998. Has anyone actually had luck getting a reviewer to accept a ZIP file, or is that just wishful thinking? I’ve never had one say yes, but maybe some cities are more chill about it...


Reply
history_holly

- Totally get it - my “final_final_REALLY” folder is out of control.
- I’ve tried the ZIP route, but our city’s portal just spits it back with a generic error. Never had a reviewer say yes.
- Anyone ever get away with using underscores instead of spaces? I heard some systems are less picky about that...


Reply

I’ve tried the ZIP route, but our city’s portal just spits it back with a generic error.

Honestly, I’ve had the opposite experience - ZIPs have worked for me, but only after I renamed every file with numbers and dashes. Underscores didn’t seem to matter either way. Maybe it’s just how each city’s system is set up? I wouldn’t trust any “magic” naming trick until you test it. Bureaucracy always finds a new way to trip you up...


Reply
finnquantum686

Has anyone actually gotten a clear answer from their city about what file naming conventions they want? I tried calling ours and just got bounced around departments. It’s wild how something as basic as a dash or underscore can break the whole process. Did you have to compress your files a certain way, or was it just the names that mattered? I’m starting to wonder if there’s some hidden file size limit too...


Reply
beekeeper341325

I ran into the same mess last year - couldn’t get a straight answer on file names, and they kicked back my plans twice for “formatting issues.” Did anyone actually get told if PDFs need to be flattened or if bookmarks are a problem?


Reply
chess270

Title: Dealing with city red tape for building approvals

I swear, the file naming thing nearly broke me. I thought I was being clever with “kitchen_reno_final_FINAL.pdf” but apparently, the city doesn’t appreciate my sense of humor or my caps lock. First submission? Rejected for “improper document labeling.” Second try? They said my PDF was “not properly flattened.” At that point, I was convinced flattening was a yoga pose, not a file thing.

Here’s how it went for me, in case it helps (or at least gives someone a laugh):

Step 1: Exported my plans from SketchUp as a regular PDF, because who reads the manual?
Step 2: Uploaded. Waited. Got a rejection email with a mysterious checklist.
Step 3: Googled “flatten PDF” and realized it’s not about pancakes. Downloaded a free PDF editor, hit “flatten,” and hoped for the best.
Step 4: Uploaded again. This time, they said I had “excessive bookmarks.” I didn’t even know bookmarks were a thing in PDFs, let alone excessive ones.
Step 5: Opened the PDF, deleted all bookmarks (which meant clicking through every page because of course I’d bookmarked every section for my own sanity).
Step 6: Uploaded for the third time. Success… or so I thought. Turns out, they wanted the file named “123_Main_Street_Plans.pdf” and not “kitchen_reno_final_FINAL.pdf.” Back to square one.

Moral of the story: the city’s formatting rules are like Fight Club - no one talks about them, and if you break them, you get kicked out. I never got a straight answer about bookmarks either. My advice? Assume they want it as boring and flat as possible, and don’t get creative with file names unless you enjoy rejection emails.

If you ever figure out who actually knows these rules, let me know. I’m convinced it’s just one person in a basement somewhere, making it up as they go.


Reply
megan_explorer

the city’s formatting rules are like Fight Club - no one talks about them, and if you break them, you get kicked out.

That line cracked me up because it’s so true. I’m right there with you - spent two weeks trying to figure out why my “livingroom_update_v2.pdf” wasn’t good enough. Turns out, they wanted everything in all caps, no spaces, and the address first. Who knew? Honestly, I think they just want to see how many hoops we’ll jump through before giving up. At least now I know to keep things as plain as possible... creativity is apparently a punishable offense.


Reply
crypto_rocky

I had a similar experience but with the naming convention for my kitchen remodel plans. I thought I was being super organized by labeling everything with dates and room names, but apparently, that’s not what they want at all. They rejected my submission because I didn’t put the parcel number first, and then everything had to be in a specific order - address, parcel, project type, etc. It’s almost like they’re testing how closely you read the fine print.

It’s a little frustrating how little of this is actually spelled out anywhere. I combed through their guidelines and still missed it. Makes me wonder if there’s some unwritten list of “gotchas” that only insiders know about. Did anyone else notice if there’s an actual checklist or reference sheet that covers these weird formatting rules, or is it just trial and error for everyone? I’m curious if there’s a way to avoid getting bounced back so many times.

Also, has anyone tried calling the city office directly to ask about this stuff? I left a voicemail but haven’t heard back yet. Part of me wonders if they’d even give a straight answer, or just point back to that same vague PDF. It feels like there should be a better way to make this process less mysterious... or maybe that’s just wishful thinking.


Reply
milo_rebel

I’ve run into the same thing with a duplex project - got dinged for not putting the APN first in the file name, even though the guidelines just said “include parcel info.” It’s wild how much of this stuff isn’t spelled out. Has anyone actually gotten a clear answer from a city planner, or is it always just “refer to the guidelines”? I sometimes wonder if there’s an internal checklist they use that we never see. If you do get a call back, I’d be curious if they actually clarify anything or just repeat what’s already online.


Reply

Title: Dealing with city red tape for building approvals

Honestly, it’s like they’re guarding the Holy Grail of file naming conventions. Last time I submitted plans for my 1920s place, I got bounced for not labeling a PDF “correctly” - whatever that means. I swear there’s some secret city planner handbook none of us are allowed to see. I’ve called and gotten the same “refer to guidelines” spiel, but once in a while you get someone who’ll actually walk you through it step by step… if you catch them before lunch. Otherwise, it’s a mystery.


Reply
jerryc42

Yeah, the file naming thing tripped me up too. I had to resubmit three times because I put “_final” at the end instead of their weird code. Ended up making a checklist for myself: double-check file names, confirm PDF layers are flattened, and always call before uploading. It’s ridiculous, but it saved me another round of rejections.


Reply
swriter22

Man, I feel you on the checklist thing. It’s wild how something as tiny as a file name can hold up a whole project. I’ve had to redo paperwork just because I used dashes instead of underscores - felt like a scavenger hunt with no prize. But hey, you figured out a system that works for you, and that’s half the battle. These hoops are annoying, but you’re getting through it.


Reply
patactivist

Yeah, the tiniest details can trip you up - been there more times than I care to admit. I’ve had inspectors send back plans just because a measurement was off by a fraction or a label wasn’t in the right spot. Makes you wonder if they’re actually looking at the big picture or just hunting for technicalities. Have you ever tried submitting everything digitally? Sometimes the online portals are even pickier than the people behind the desk...


Reply
astrology248

I hear you on the digital submissions being a pain. Last year I tried to get approval for a new porch railing - nothing fancy, just something that wouldn’t look out of place on a 1920s house. The online portal kicked back my application three times because the photo file size was “too large” or the scanned signature wasn’t “clear enough.” Meanwhile, when I finally dragged everything down to the office in person, the guy behind the counter barely glanced at half of it and stamped it through.

Honestly, sometimes I think the digital systems are set up just to weed people out. It’s like they want you to give up before you even start. I get that details matter, especially with old homes, but it feels like they’re missing the forest for the trees. Give me a real person over an online checklist any day... even if they’re picky, at least you can talk things through.


Reply
lpupper85

I get where you’re coming from, but I actually prefer the digital stuff - at least in theory. Isn’t it supposed to save us time and trips across town? I mean, yeah, the file size thing is annoying, but once you figure out their weird requirements, you can just upload from home and not have to take off work. Plus, with in-person, you never know if you’ll get someone who’s having a bad day and decides to nitpick everything. Maybe the real issue is they don’t make the online process clear enough? Or maybe I’m just too cheap to pay for parking downtown...


Reply
fitness505

Honestly, I hear you on the digital side being more convenient - at least in theory. But in practice, I’ve run into a few headaches that make me question if it’s really saving time. Here’s what I’ve noticed after a bunch of projects:

- The file size limits are all over the place. Sometimes you compress everything down, but then the plans are unreadable. Other times, their portal just crashes mid-upload and you have to start over.
- The instructions for what they want (file types, naming conventions, etc.) are usually buried in some outdated PDF or hidden behind three links. I’ve had submissions kicked back just because I used “PlanSet1” instead of “Plan_Set_1.” No joke.
- On the flip side, when you go in person, at least you can get immediate feedback. If something’s off, they’ll usually point it out right there and you can fix it on the spot. Online, you might wait a week just to get a vague rejection note.

That said, not having to pay for parking or take half a day off work is a big plus. I’m with you there.

What’s worked for me:
- Call the permit office and ask for their most recent digital submission checklist. Sometimes they’ll email you a cheat sheet that isn’t even posted online.
- Double-check file names and formats before uploading - sounds basic but it’s saved me from dumb rejections.
- If your city has a “pre-screen” option online, use it. Cuts down on surprises later.

I still think the digital process could be way clearer. Maybe they’re just playing catch-up tech-wise, or maybe they want to keep us guessing... Either way, I’d rather deal with clunky uploads than another round of downtown parking meters.

Just my two cents from getting bounced around both systems more times than I care to admit.


Reply
river_walker

Sometimes you compress everything down, but then the plans are unreadable.

Man, I’ve had that happen more times than I’d like to admit. Last month, I sent in a set that looked like a pixelated treasure map by the time it finally fit under their 25MB limit. Got it kicked back for “illegible details.” No kidding. I do miss being able to just point at a sheet and say, “See, that’s a window, not a smudge.” But yeah, not having to circle the block for parking is worth something… even if I’m now fighting with PDFs instead of meters.


Reply
sophiesinger

I sent in a set that looked like a pixelated treasure map by the time it finally fit under their 25MB limit.

That’s basically what happened with my kitchen reno plans. I spent hours getting every cabinet and outlet just right, then had to shrink the file so much the inspector called to ask if I’d drawn it with a crayon. I get why they want things digital, but honestly, sometimes it feels like they care more about file size than what’s actually on the page. Still beats waiting in line at city hall, but barely.


Reply
Scroll to Top