Notifications
Clear all

EARTHQUAKE-PROOFED MY FIRST BUILDING AND IT ACTUALLY WORKED

474 Posts
444 Users
0 Reactions
5,306 Views
aspen_biker
Posts: 17
(@aspen_biker)
Active Member
Joined:

- Been there with the overthinking—spent way too long debating if my anchor bolts were spaced “perfectly” or just “good enough.”
- Contractors always roll their eyes, but hey, it’s not their money on the line if something shifts, right?
- I get a little obsessive about the details, but honestly, I’ve seen what happens when people cut corners. Had a buddy who skipped some blocking to save time… let’s just say his drywall guy was not happy after the first tremor.
- Sometimes I wonder if we’re actually making things safer or just giving ourselves peace of mind. Like, is there such a thing as too much bracing? Or is that just what keeps us sleeping at night?
- Either way, I’d rather be the “paranoid” one than the one explaining to a buyer why their walls are cracked six months later.
- At least we can laugh about it after the inspection passes and everything’s still standing.


Reply
archer13
Posts: 14
(@archer13)
Active Member
Joined:

Totally get where you’re coming from on the “paranoid” side of things. I’ve watched people try to save a few bucks or a little time, and it always comes back to bite them—especially when it’s something structural. I remember working on a remodel where the client insisted on skipping extra bracing in a partition wall because “it’s just decorative.” Fast forward to the first minor quake, and suddenly their fancy tile feature was a cracked mess. Guess who got called in to “fix the design”? Not the contractor.

I do think there’s a line between overkill and smart planning, but honestly, I’d rather have too much bracing than not enough. Peace of mind is worth something, especially when you’re the one who has to answer for it later. And yeah, contractors might roll their eyes, but they’re not the ones living with the results. At the end of the day, I’d rather be called picky than have to explain why someone’s new kitchen island is now an abstract art piece after a tremor.


Reply
bens98
Posts: 13
(@bens98)
Active Member
Joined:

Couldn’t agree more—cutting corners on structure always comes back around. I’ve had clients push back on extra anchors or straps, then regret it after the first shake. Curious, did you run into any surprises with your first earthquake-proof build? Sometimes the smallest details make the biggest difference.


Reply
tea_laurie
Posts: 4
(@tea_laurie)
New Member
Joined:

- Had a similar experience on my first seismic retrofit. Thought I was being thorough, but the inspector flagged a couple of things I’d never even considered—like the spacing on the hold-downs and the type of washers used.
- Clients always want to save a buck, but after seeing what even a minor quake can do, I’m way less flexible on structural stuff.
- Biggest surprise for me: how much difference those “extra” straps and anchors actually make. I used to think some of it was overkill, but after watching a neighboring building lose some brickwork while mine barely creaked... yeah, not cutting corners anymore.
- One thing I underestimated was how much time it takes to get all the right hardware in place. It’s not just about buying more straps—it’s about making sure they’re installed exactly right. Missed one anchor by an inch and had to redo half a wall.
- Also, didn’t expect how much insurance premiums drop when you show them the engineering reports and photos of all the reinforcements. That was a nice bonus.
- Not sure if you ran into this, but city inspectors here are super picky about nailing patterns and bolt torque now. Used to be more relaxed, but after that last big shake, they’re all over every detail.

Honestly, I used to roll my eyes at some of these requirements, but after seeing what happens when people skip steps... yeah, lesson learned. Now I just budget for it upfront and explain to clients that it’s non-negotiable if they want me involved.


Reply
Posts: 18
(@finnrogue966)
Eminent Member
Joined:

Biggest surprise for me: how much difference those “extra” straps and anchors actually make. I used to think some of it was overkill, but after watching a neighboring building lose some brickwork while mine barely creaked... yeah, not cutting corners anymore.

I hear you on that. I used to think a lot of the extra bracing was just code creep, but after retrofitting our 1920s place, I’m convinced. We had a moderate quake a couple years back and honestly, the house barely shifted—meanwhile, the neighbor’s chimney collapsed and they ended up with cracked plaster everywhere.

One thing that really surprised me: how much old framing can flex if it’s not tied down right. We found some weird stuff in our crawlspace... like original square nails just sort of floating in air where the sill plate had shrunk away from the foundation. Installing the right anchors took forever, but I’m glad we didn’t rush it.

And yeah, inspectors have gotten way more picky here too. Had to redo a bunch of anchor bolts because they wanted torque specs documented—not something I’d ever thought about before. It’s a pain, but looking back, I’d rather deal with paperwork than repairs after a quake.


Reply
Page 58 / 95
Share:
Scroll to Top