HOW LONG DID YOUR POOL MAKEOVER REALLY TAKE?

Honestly, I was bracing myself for a months-long nightmare, but our pool remodel wrapped up in just under four weeks. There were a couple rainy days and one weird delay with the tile shipment, but overall, it went way smoother than I expected. Anyone else have a surprisingly quick (or maybe not-so-quick) experience? Curious if we just got super lucky or if that's kinda normal.


Join the conversation

Share your experience or ask a follow-up question.

108 replies

cherylt55

there were a couple rainy days and one weird delay with the tile shipment, but overall, it went way smoother than I expected.

Honestly, four weeks is pretty fast for a pool remodel - especially with weather and supply hiccups in the mix. Most jobs I’ve been on, it’s more like 6-8 weeks, sometimes longer if there’s custom work or permits dragging things out. You probably had a crew that really knew their stuff, or just got lucky with scheduling. It’s not unheard of, but definitely not the norm in my experience.


Reply
rperez62

Four weeks? That’s practically lightning speed in pool world. I’ve seen projects drag on for months just because someone couldn’t decide between two shades of blue tile. Maybe you had the magic combo - good crew, decent weather, and a little luck.


Reply
summit_cyber

- Four weeks is impressive, no doubt.
- In my experience, even with a solid plan, there’s always some hiccup - weather delays, supply chain issues, or just plain indecision over finishes.
- You probably did have the right mix of crew and timing.
- I’ve seen neighbors get stuck for ages just waiting on a specific coping stone to come in...
- Sometimes, being decisive really does speed things up.
- Either way, you should feel good about how smoothly it went.


Reply
cmitchell70
cmitchell70 Topic starter

TITLE: HOW LONG DID YOUR POOL MAKEOVER REALLY TAKE?

Four weeks is honestly faster than I’d expect, given how these projects tend to spiral. I’ve been through a couple pool and patio redos over the years, and I can’t say any of them wrapped up in under a month. The last one was supposed to be “six weeks, tops” - ended up closer to three months. Part of it was my own fault; I kept second-guessing the plaster color, and the contractor seemed happy to drag things out while waiting for my decision.

Can’t help but think decisiveness really is half the battle. The other half is just dumb luck with materials and weather, like you said. I do wonder if crews are moving faster these days, or if you just managed to dodge the usual headaches. Either way, you definitely beat the odds compared to what I’ve seen. If I ever do another remodel, I’m sticking to my choices and crossing my fingers for your kind of timeline.


Reply

Can’t help but think decisiveness really is half the battle.

Couldn’t agree more. Every time I’ve waffled on tile or coping, the timeline just stretched. Last time, I swore I’d pick everything before demo started… still ended up changing the waterline tile mid-project. Guess some of us just can’t help ourselves. Four weeks is wild - maybe you found the one contractor who doesn’t secretly love a long lunch break.


Reply

Four weeks? That’s like Bigfoot-level rare in pool renos. I tried the “choose everything before demo” strategy too - ended up with three sample boards propped against the fence for a week while I squinted at them after work. Still changed my mind on grout color halfway through. It’s like some kind of home improvement law: the more choices, the more second-guessing.

If you want to keep things moving (and your wallet from crying), here’s what finally worked for me:

1. Lock in tile, coping, and plaster before anyone swings a hammer.
2. Write it down, sign it, and tape it to the fridge. Treat it like a sacred oath.
3. Ignore all new Pinterest ideas after the contract’s signed. Seriously, just don’t look.

Even then, something always pops up. My pool guy found an “unexpected” pipe and suddenly we were on a two-day lunch break. At this point, I just build in an extra week for “contractor yoga” - aka, waiting around while they “source materials.”

Decisiveness helps, but a sense of humor helps more.


Reply
jackscott886

Totally get what you mean about second-guessing - my “final” tile choice lasted about 48 hours before I swapped it out. I’d add: double-check your contractor’s schedule, too. Mine juggled three jobs at once, so my “six-week” reno stretched to almost nine. Patience is a must... and maybe a backup plan for backyard chaos.


Reply
jerryinferno637

Yeah, the “six weeks” estimate is almost never real, right? Ours was supposed to be done before Memorial Day, but we were still dodging wheelbarrows and tarps in July. I started joking that our backyard looked like a set from a disaster movie. On the bright side, I got really good at grilling on the front porch. The tile indecision is so relatable - my husband still teases me about the sample graveyard in our living room.


Reply
mythology_mocha

I can definitely relate to the “six weeks” myth. Ours was supposed to be a quick refresh - just new coping and tile - but it ended up dragging for almost four months. The project manager kept blaming weather delays, but honestly, I think half the time it was just scheduling issues with subcontractors. I spent way too long agonizing over grout colors, too... There’s still a stack of tile samples in my garage that I can’t bring myself to toss.


Reply

I spent way too long agonizing over grout colors, too... There’s still a stack of tile samples in my garage that I can’t bring myself to toss.

Totally get it - I think I spent more time debating between “greige” and “warm gray” grout than the actual tile install took. The delays are rough, especially when you’re watching the budget stretch longer than planned. Did you feel like the extra months added to the cost, or was it more just frustration? I still have leftover samples too... can’t help but think they might come in handy someday, but probably not.


Reply
lisaswimmer

I still have a drawer full of grout color swatches from our last pool project... I kept thinking I'd use them for touch-ups or something, but nope. And yeah, the extra months definitely pushed up the costs - storage fees, more takeout, you name it. I actually think picking the grout took longer than demoing the old tile, not even kidding.


Reply

I actually think picking the grout took longer than demoing the old tile, not even kidding.

You’re not wrong - grout color selection is where time goes to die. I’ve seen folks breeze through demolition like it’s a CrossFit challenge, then freeze up in the tile aisle for hours, holding up swatches and squinting at them in different lighting. I once had a client who made a spreadsheet just for grout options. Not even kidding.

And those “just in case” leftover swatches? I swear they multiply in the dark. I’ve got a whole toolbox that’s basically a graveyard of sample chips and half-used caulk tubes.

The cost creep is real too. People always budget for materials and labor, but nobody ever factors in the pizza delivery bills or the price of sanity after week six of living with tarps everywhere. At this point, I tell folks: plan for delays, expect to eat more takeout than you want, and accept that you’ll never look at grout the same way again.


Reply
linda_mitchell

The cost creep is real too. People always budget for materials and labor, but nobody ever factors in the pizza delivery bills or the price of sanity after week six of living with tarps everywhere.

I get what you mean about the hidden costs, but honestly, I found the waiting-for-contractors phase way more brutal than grout decisions. At least with grout, you feel like you’re making progress. Waiting for someone to show up? That’s where my sanity went.


Reply
juliegamerdev

Waiting for contractors is a special kind of torture, honestly. I remember thinking, “Hey, demo day is done, we’re moving!” - then nothing for two weeks except dust and a half-dug hole. At least picking tile colors felt like progress, even if it took forever to decide. Did you run into any surprise delays, or was it just the usual no-shows?


Reply
jennifer_phillips

HOW LONG DID YOUR POOL MAKEOVER REALLY TAKE?

I totally get what you mean about the “demo day high” followed by the “now what?” slump. Ours was supposed to be a six-week job, but it stretched closer to three months. Here’s how it played out for us, step-by-step:

1. Demo and dig: Fast and furious for about four days. Then…crickets. The crew vanished for almost two weeks because of “equipment issues.”
2. Plumbing and electrical: This part was actually smooth, but only because I called every other day to check in.
3. Tile and coping: Picking tile took us forever too - my partner and I couldn’t agree on anything. Once we finally decided, the supplier was out of stock. Cue another week of waiting.
4. Plaster and fill: By this point, I was just happy to see water in the pool, even if it was green at first.

Honestly, I expected some delays, but the no-shows were the worst. If I could do it again, I’d ask for a more detailed schedule up front and maybe stock up on patience (and snacks). It’s wild how picking grout color starts to feel like a major milestone...


Reply
lisawilson695

HOW LONG DID YOUR POOL MAKEOVER REALLY TAKE?

That “demo day high” is so real - then suddenly you’re staring at a giant hole for weeks, right? When I redid my own pool, the timeline got away from us, too. I thought my background in design would help keep things on track, but nope. The tile selection took way longer than expected (who knew there were so many shades of blue?), and the weather didn’t help either. My advice: build in extra time for those little decisions that seem minor but end up taking forever. And yeah, snacks definitely help when you’re waiting for someone to show up...


Reply
musician76

You nailed it with the “demo day high” - it’s like a shot of espresso, then suddenly you’re in a construction hangover staring at mud. I always tell folks: picking tile is like falling into a rabbit hole. You think you want “blue,” then you’re debating between “ocean mist” and “midnight lagoon” for three days. Weather delays are the cherry on top. Honestly, if you finished in under three months, you’re basically a legend.


Reply
bellaf66

Totally get what you mean about the tile rabbit hole - it’s wild how many shades of “blue” exist once you start looking. I’ve seen clients agonize over grout color for a week, too. Sometimes I wonder if it’s even possible to finish in three months unless you’ve got zero rain and make every decision on the spot. Did you run into any surprise issues with the pool shape or plumbing? That always seems to add a week or two in my experience.


Reply
ray_king

Sometimes I wonder if it’s even possible to finish in three months unless you’ve got zero rain and make every decision on the spot.

Three months? That sounds like a fantasy novel to me. I went into our pool makeover thinking, “We’re just swapping out some tile, maybe a new pump… how bad could it be?” Well, let’s just say my backyard looked like a construction zone for the better part of a semester. The number of blue tile samples that ended up on my kitchen counter was honestly impressive - I started rating them like wine: “This one has a hint of Mediterranean sadness, while this other blue is more ‘regret after vacation.’”

And grout color... I thought that would be the easy part. My spouse and I debated between “cloud white” and “arctic fog” for days before realizing they looked exactly the same when wet. At some point, you just have to close your eyes and pick one, or you’ll be living with a mud pit until next summer.

As for surprise issues, the pool shape didn’t throw us (thankfully), but plumbing was another story. We discovered our old pipes were basically fossilized. The crew had to dig up more than planned, which meant extra time and - of course - extra dollars. If you’re working with an older pool, budget a little extra for “unexpected archeological finds” under the deck.

Rain delays are real too. One good storm and suddenly everything’s pushed back a week. If you’re trying to keep costs down, my advice is to make as many decisions as possible before anyone picks up a sledgehammer. Otherwise, you’ll end up impulse-buying “Caribbean Mist” tiles at 2am because you’re tired of looking at samples.

In the end, our three-month plan took almost five. Not terrible, but not what we’d hoped either. Would I do it again? Maybe after I recover from all the grout-related stress...


Reply