Where should pool-deck runoff go near the house?
A pool deck has to shed rain and splash away from the house, but the layout also needs to avoid sending that water toward the coping or leaving it where people walk. I’m not sure how contractors balance those goals when the house doors and pool edge are close to the deck.
How much does the right slope depend on the deck material and layout? Would a linear drain near the house threshold make sense in some designs, or is it usually better to direct runoff to another collection point? I’d be interested in what details you’d settle with the pool contractor before choosing the approach.
7 replies
A linear drain at the house threshold can help, but it only solves the problem if there’s a dependable route for the water after it enters the drain. Before pricing that option, I’d confirm where it discharges and what happens if the outlet is blocked or overwhelmed; if it needs a pump, include access and ongoing maintenance in the cost. Is there a feasible gravity outlet at this site?
A pump isn’t necessarily the default for a threshold drain; it depends on whether there’s a workable gravity outlet. I’d settle the discharge route and overflow plan with the contractor first, then compare the pump’s access and maintenance costs if gravity drainage isn’t feasible.
The material can change how the slope works in practice: water may run across the surface, or some may get through joints, depending on the deck system. I’d ask the contractor to show how the proposed grading relates to the finished door threshold and pool coping elevations, not just the direction of the arrows on a plan. With so little space between them, do those elevations leave a workable slope without creating a low spot at either edge?
The arrows on a plan can show the intended direction, but they don’t tell you what’s included in the price. I’d ask for a dimensioned grading plan with the drain locations and finished elevations called out, then have the contract refer to it. That gives both sides a clearer basis for pricing changes and checking the finished work.
The usable run between the door side and the pool edge matters as much as the chosen slope. If there isn’t enough distance to create the needed fall without making the deck awkward or risky to walk across, forcing one steeper plane may be the wrong solution; an intermediate collection channel could let the grading break into smaller sections. The contractor should show how that option fits the finished elevations, since acceptable slopes depend on the surface and applicable local requirements.
An intermediate channel won’t resolve the trade-off by itself. The plan should show which way each deck section slopes from the channel: otherwise, one section could still send water toward the coping, or make runoff cross the main walking route before it reaches collection. The grading direction needs to account for both.
Open-jointed paving can change where runoff needs to be collected. Some water may pass through the finish instead of reliably reaching a surface channel, so the drainage layer below also needs a planned route out. I’d ask the contractor to show how the deck system handles both water running across the surface and water entering the joints; surface grading alone may not account for both.